New Recording Studio Contruction pictures
Posted: Tue Oct 17, 2006 1:08 pm
Glad to see we are back online. I have been MIA for last 2 months trying complete my new recording/rehearsal studio. I thought I would post some pictures of the progress. The main room is brick contruction, 600sq', 9 1/2' ceilings and the seperate control room is 250sq'. Visual monitoring will be done via webcam. Tracking will be done on analog multitracks.
I have built this into my home so I no longer have to travel accross town for rehearsal or recording.
This project has been tricky, the electrical had to be re-done completely and the walls had to be double layer sheetrocked then 1/2" soundboard added, plus double door systems installed etc. I still have more Sonex foam to add to the walls and some painting and caulking. Since the pictures have been taken tracklighting has been added. Not perfect yet but it's coming along.
Cheers,
Eric
*Note: click on "large" or "original" for a larger view when you get to the hosting site.
main room underway..
http://www.esnips.com/doc/6d0254cd-437a ... uction.jpg
back of room..
http://www.esnips.com//r/td/doc/e306170 ... uction.jpg
another angle..
http://www.esnips.com/doc/7f6d72ed-a63f ... P_2663.jpg
finsished front wall..
http://www.esnips.com/doc/ecdbb32a-aeb7 ... k-Wall.jpg
opened up side room..
http://www.esnips.com//r/td/doc/647fbe6 ... e-Wall.jpg
equipment on new carpet...
http://www.esnips.com//r/td/doc/8a03b29 ... STUDIO.jpg
Vistalite Ludwig Drums and Marshalls..
http://www.esnips.com//r/td/doc/bcb47d1 ... -Drums.jpg
The Marshalls guarding the control room tape decks..
http://www.esnips.com/doc/3d3dc98f-d81c ... 40C-1".jpg
I have built this into my home so I no longer have to travel accross town for rehearsal or recording.
This project has been tricky, the electrical had to be re-done completely and the walls had to be double layer sheetrocked then 1/2" soundboard added, plus double door systems installed etc. I still have more Sonex foam to add to the walls and some painting and caulking. Since the pictures have been taken tracklighting has been added. Not perfect yet but it's coming along.
Cheers,
Eric
*Note: click on "large" or "original" for a larger view when you get to the hosting site.
main room underway..
http://www.esnips.com/doc/6d0254cd-437a ... uction.jpg
back of room..
http://www.esnips.com//r/td/doc/e306170 ... uction.jpg
another angle..
http://www.esnips.com/doc/7f6d72ed-a63f ... P_2663.jpg
finsished front wall..
http://www.esnips.com/doc/ecdbb32a-aeb7 ... k-Wall.jpg
opened up side room..
http://www.esnips.com//r/td/doc/647fbe6 ... e-Wall.jpg
equipment on new carpet...
http://www.esnips.com//r/td/doc/8a03b29 ... STUDIO.jpg
Vistalite Ludwig Drums and Marshalls..
http://www.esnips.com//r/td/doc/bcb47d1 ... -Drums.jpg
The Marshalls guarding the control room tape decks..
http://www.esnips.com/doc/3d3dc98f-d81c ... 40C-1".jpg